
Year
In 2021, China's first pebble bed high-temperature air-cooling reactor nuclear power demonstration project --- Shandong Shidaowan nuclear power unit was successfully connected to the grid.

Year
In 2021, the world's first 1000MW “double reheat + dual unit heat regenerative" steam turbine was put into operation at Ruijin Power Plant.

Year
In 2021, "Hualong No.1", Pakistan Karachi Unit 2, the first overseas reactor of the third-generation nuclear power unit developed by China, was successfully connected to the grid.

Year
In 2020, the 1240MW single shaft thermal power unit was successfully put into operation at Yangxi Power Plant.

Year
2016, the first Ansaldo E-class ae94.2 gas turbine

Year
2016

Year
2015

Year
2013, the first million nuclear power unit

Year
2013

Year
2007

Year
Gas turbine (Shidongkou Power Plant)

Year
2006.01

Year
2006

Year
2002

Year
2001

Year
2000

Year
1998

Year
1996

Year
1992

Year
1988

Year
1987

Year
1974

Year
1969

Year
1955